{"id":430,"date":"2019-05-27T02:21:45","date_gmt":"2019-05-27T02:21:45","guid":{"rendered":"https:\/\/bimworks.uk\/eng\/?p=430"},"modified":"2021-11-16T18:53:12","modified_gmt":"2021-11-16T18:53:12","slug":"boston-bimforum-call-for-presentations","status":"publish","type":"post","link":"https:\/\/bimworks.uk\/eng\/2019\/05\/27\/boston-bimforum-call-for-presentations\/","title":{"rendered":"Boston BIMForum &#8211; Call for Presentations"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Via :&nbsp;<a href=\"https:\/\/bimforum.org\/2013\/10\/31\/boston-bimforum-call-for-presentations\/\">BIMForum<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Theme:<\/strong>&nbsp;Optimizing Design with BIM<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">April 23-24, 2014 in Boston, Massachusetts<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Implementation of building information modeling processes in the design professions has steadily increased over the past 5 years as shown by the McGraw-Hill study \u201cThe Business Value of BIM in North America,\u201d but are we truly improving the built environment and the process by which it is delivered?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In past BIMForum events, we have discussed \u2018Return on Innovation Investment\u2019 as well as bridging the gap between design and construction. This spring, we will return to design and engineering in order to showcase the best examples of collaboration, optimization, and sustainability. We are seeking individuals or teams with real world project examples to share their successes and challenges and address one or more of the following questions:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 How do you use BIM to develop and drive design?<br>\u2022 How are you determining project objectives and then measuring them through BIM?<br>\u2022 What\u2019s \u2018design assist\u2019 and what is happening with IPD?<br>\u2022 How do you use BIM to keep clients engaged and make high-value decisions?<br>\u2022 What are the opportunities and challenges of an engineering-to-fabrication workflow?<br>\u2022 How much detail is really necessary in a design model to support downstream uses?<br>\u2022 How do standards and quality control affect an integrated team approach?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Submission Deadline:<\/strong>&nbsp;Wed Jan 15 2014, 5:00pm EST<br><strong>To submit a proposal go<\/strong><strong>&nbsp;<a href=\"http:\/\/proposalspace.com\/calls\/d\/313\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a><\/strong><strong>.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Via :&nbsp;BIMForum Theme:&nbsp;Optimizing Design with BIM April 23-24, 2014 in Boston, Massachusetts Implementation of building information modeling processes in the design professions has steadily increased over the past 5 years as shown by the McGraw-Hill study \u201cThe Business Value of BIM in North America,\u201d but are we truly improving the built environment and the process [&hellip;]\n","protected":false},"author":1,"featured_media":431,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[],"class_list":["post-430","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/posts\/430","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/comments?post=430"}],"version-history":[{"count":3,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/posts\/430\/revisions"}],"predecessor-version":[{"id":1697,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/posts\/430\/revisions\/1697"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/media\/431"}],"wp:attachment":[{"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/media?parent=430"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/categories?post=430"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/tags?post=430"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}