{"id":710,"date":"2019-06-30T23:05:17","date_gmt":"2019-06-30T23:05:17","guid":{"rendered":"https:\/\/bimworks.uk\/eng\/?page_id=710"},"modified":"2022-01-28T16:08:17","modified_gmt":"2022-01-28T16:08:17","slug":"as-built-modelling","status":"publish","type":"page","link":"https:\/\/bimworks.uk\/eng\/products\/as-built-modelling\/","title":{"rendered":"As-Built Modelling"},"content":{"rendered":"<p><\/p>\n<div class=\"message-box relative\" style=\"padding-top:20px;padding-bottom:20px;\"><div class=\"message-box-bg-image bg-fill fill\" ><\/div><div class=\"message-box-bg-overlay bg-fill fill\" style=\"background-color:rgb(225, 225, 225);\"><\/div><div class=\"container relative\"><div class=\"inner last-reset\">\n\n<div class=\"row align-middle align-center\"  id=\"row-440058293\">\n\n<div class=\"col medium-4 small-12 large-4\"  ><div class=\"col-inner\"  >\n\n<p>AS-BUILT MODELLING (6D)<\/p>\n\n<\/div><\/div>\n<div class=\"col medium-8 small-12 large-8\"  ><div class=\"col-inner\"  >\n\n\n<\/div><\/div>\n\n\n<style scope=\"scope\">\n\n<\/style>\n<\/div>\n\n<\/div><\/div><\/div>\n<div class=\"gap-element\" style=\"display:block; height:auto; padding-top:30px\" class=\"clearfix\"><\/div>\n\n<div class=\"row\"  id=\"row-1413259925\">\n\n<div class=\"col medium-8 small-12 large-8\"  ><div class=\"col-inner\"  >\n\n<p><strong>The 6D Model refers the incorporation of all the management components of a project to the 3D model in order to have a more efficient control system in its operation and maintenance.<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-714\" src=\"https:\/\/bimworks.uk\/eng\/wp-content\/uploads\/2019\/06\/WEB-AS-BUILT.png\" alt=\"\" width=\"700\" height=\"200\" \/><\/p>\n<p>The 6D model is delivered to the client once the project has been finished. To this end, an \u00abAs-Built\u00bb model is prepared that contains all the information that has been used in the construction process, in addition to the information associated with the future administration of the building. A model\u2019s As-Built 6D precision helps building facility managers achieve more efficient operation and maintenance results throughout the building\u2019s life span.<\/p>\n<p>SERVICE DETAILS<\/p>\n<ul class=\"checklist\">\n<li>Updated advanced 3D model with modifications made at the end of the project.<\/li>\n<li>Operations and Maintenance control system.<\/li>\n<li>Facility Management.<\/li>\n<\/ul>\n\n<\/div><\/div>\n<div class=\"col medium-4 small-12 large-4\"  ><div class=\"col-inner\"  >\n\n<p>M\u00c1S PRODUCTOS<\/p>\n<div class=\"is-divider divider clearfix\" style=\"margin-top:0.3em;margin-bottom:0.3em;background-color:rgb(221, 221, 221);\"><\/div><!-- .divider -->\n\n<h5><a href=\"https:\/\/bimworks.uk\/eng\/productos\/modelado-avanzado-3d\/\">MODELADO AVANZADO (3D)<\/a><\/p>\n<p><a href=\"https:\/\/bimworks.uk\/eng\/productos\/secuencia-constructiva-4d\/\">SECUENCIA CONSTRUCTIVA (4D)<\/a><\/p>\n<p><a href=\"https:\/\/bimworks.uk\/eng\/productos\/cubicacion-y-costos-5d\/\">CUBICACI\u00d3N Y COSTOS (5D)<\/a><\/p>\n<p><a href=\"https:\/\/bimworks.uk\/eng\/productos\/reporte-de-colisiones-e-interferencias\/\">REPORTE DE COLISIONES E INTERFERENCIAS<\/a><\/p>\n<p><a href=\"https:\/\/bimworks.uk\/eng\/productos\/modelo-as-built-6d\/\">MODELO AS-BUILT (6D)<\/a><\/p>\n<p><a href=\"https:\/\/bimworks.uk\/eng\/productos\/visualizaciones-publicitarias\/\">VISUALIZACIONES PUBLICITARIAS<\/a><\/h5>\n\n<\/div><\/div>\n\n<\/div>\n<p>\n<\/p>","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":663,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-blank.php","meta":{"footnotes":""},"class_list":["post-710","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/pages\/710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/comments?post=710"}],"version-history":[{"count":11,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/pages\/710\/revisions"}],"predecessor-version":[{"id":1861,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/pages\/710\/revisions\/1861"}],"up":[{"embeddable":true,"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/pages\/663"}],"wp:attachment":[{"href":"https:\/\/bimworks.uk\/eng\/wp-json\/wp\/v2\/media?parent=710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}