This type of modeling consists of a digital model elaborated through the raising of 2D drawings into a three-dimensional space integrated with information, from which packages such as coordinated planimetry, interference reports, measurement quantifications, and commercial visualizations can be extracted.
The construction of a 4D Integrated Model allows the Clients and their teams of professionals to analyze the progress in the programming of a project through the visualization of a series of sequences of all the activities associated with the construction processes throughout the duration of a project.
The use of the term 5D refers to the incorporation of the fourth dimension (Time) and the fifth dimension (Cost) to a 3D model. Thus, 5D = 3D + Time + Cost.
COLLISION AND INTERFERENCE REPORTS
These reports are prepared based on a virtual Integrated Information Model, which is systematically analyzed to reveal any points of conflict and interference between specialties that could not be visualized in the traditional 2D Project Design process.
The 6D Model refers the incorporation of all the management components of a project to the 3D model in order to have a more efficient control system in its operation and maintenance.
This term refers to the practice of managing the operation and maintenance of real estate and other properties. It is generally in charge of a professional with knowledge in management of organizations and productivity resources.
An Integrated Information Model allows us to obtain Visualizations and Animations with a high degree of realism to produce marketing presentations or generate specific views according to the client’s requirement, which allows you to clearly offer the advantages and benefits of the project to your potential clients.